
Nell Gwynn House, Sloane Avenue, London SW3
Heating, ventilation, boiler plant installation and ongoing maintenance for a prestigious London development
Situation: Built in 1936 as a block of fully serviced prestige apartments, Nell Gwynn House now boasts 436 luxury suites. When DMG Delta was contacted, the original hot water boiler plant was increasingly erratic, incurring both operational and maintenance costs. A replacement was necessary. We appointed a multi-disciplinary team of highly skilled engineers, designers and project managers to design and install a new hot water boiler plant. Ongoing building engineering maintenance was also a concern – so DMG Delta took on both contracts.
Outcome: The new boiler is both efficient and reliable. Strong project management and good communication with the client limited service downtime to only one night. A single point of contact helped increase efficiency. Not only does the new installation provide better levels of service, costs for both maintenance and fuel have been reduced.
- On-site engineer for Canary Riverside
- Permanent support at Oliver´s Yard
- Mobile service for Freud Museum
- 20 years of service at Eyre Court
- Tailored PPM for Grosvenor Place
- Heating services for Nell Gwynn House
- Air conditioning at Queen Ann Street
- Electrical safety for YHA
- Plumbing and sanitation for London townhouse
- Eco solutions for The Hub and Grassroots
- Water treatment for Westminster School
- Mechanical and electrical maintenance programme for Aspire
- Heating services to sought after properties in Chelsea
- Building maintenance services for St Mary's Church
- DMG Delta provides Cluttons with tailored maintenance regimes